Installation calendar
The calendar is the stack of gates.
A Toronto hardwood calendar stacks samples and free stain matching (1–3 weeks), condo board review when the building requires it (2–6 weeks), production lead time that is project-specific, acclimation of several days, install days that scale with area and pattern, and adhesive cure of several days after glue-down. The date is that stack, not square footage divided by crew speed.
- 1–3 weeksSamples and stainSigned colour approval, often two rounds
- 2–6 weeksBoard approvalPermit sticker, when the building requires it
- Project-specificProduction lead timeContact for details, including wide and pattern SKUs
- Several daysAcclimationMinimum, HVAC toward 35–55% RH
- ScalesInstall daysArea, stairs, rooms, and pattern
- Several daysAdhesive cureBefore heavy furniture, after glue-down
Samples and free stain matching.
Week one typically starts with on-location samples of European white oak in candidate widths: 7½, 9¼, or 10¼ inch straight plank, or pattern proofs for herringbone at 5 by 25 inches and chevron at 5 by 25½ inches. Designers compare Grade AB and Grade ABC under the window light of the room.
When millwork or an existing floor sets the colour, complimentary custom stain matching begins — often two rounds before sign-off. Production locks only after that signed colour approval. Condo projects run board paperwork in parallel so the stain work does not idle behind alteration review. Read the stain matching guide and the samples page .
Floors Toronto supplies 3/4 inch European white oak engineered hardwood (about 19 mm) with free custom stain matching across Toronto, the GTA, Yorkville, and Forest Hill — keep occupied rooms near 35–55% RH.
Lead time starts after the colour is signed.
After stain approval, 3/4 inch European white oak is released to production. Exact lead times are project-specific. Do not assume stock on 10¼ inch or pattern SKUs. Contact Floors Toronto for the date on that order.
Delivery is booked against a condo freight elevator or a house driveway. Winter deliveries plan hallway protection when salt season peaks. Summer deliveries account for RH near 60–70% in an unconditioned staging area: keep the crates in conditioned space, targeting 35–55% RH, before install. What lengthens the calendar beyond these gates is on the cost guide . Which fastening the subfloor allows is on the install methods guide .
Acclimation is several days, in the rooms.
Acclimate the planks in the install environment with HVAC at normal setpoints for several days minimum before fastening. Glue-down on Toronto condo concrete waits on moisture-testing clearance. No adhesive until the readings are documented. The service is moisture testing and prep .
Winter acclimation at 20–30% RH without humidifiers stresses seams. Run humidification toward 35–55% before the crew arrives. The seasonal essay is the winter and summer guide .
Install days scale. Cure is several days more.
Straight-plank install days scale with net square footage, room complexity, and stair or transition scope. Chevron adds layout hours versus a 7½ inch field. Herringbone at 5 by 25 inches does the same against a straight run. Condo installs book quiet-hour windows and may split days when the elevator limits access.
After glue-down, adhesive cure often requires several days before heavy furniture. Floating systems still need expansion gaps at the perimeters, and an acoustic underlay may have to be on file with the board before work starts. After cure, RH care is on the humidity guide . Field notes live on the installation overview , the condo install guide , and the product specs .
The long pole is rarely install day.
The longest pole is the intersection of signed stain approval, a board permit sticker, and a moisture-cleared slab. Cabinets ordered before stain sign-off often conflict with the oak under kitchen light. Lock complimentary custom stain matching before production release on 7½, 9¼, and 10¼ inch straight plank, and on pattern SKUs.
Condo freight elevators compete with mover bookings. Reserve the window before crates leave staging. House projects in January through March compete with driveway snow when RH sits near 20–30%, and acclimation needs humidifiers running several days minimum at a 35–55% target. Chevron at 5 by 25½ inches adds layout days beyond a straight-plank schedule. Put that in the move-in promise. Adhesive cure after glue-down is not furniture day.
Drywall dust, paint overspray, and cabinet timing all meet this calendar. Finished drywall and primed surfaces come before cartons open in the suite. Fine dust works into a UV-cured finish if planks go down mid-construction. Paint touch-ups after the floor use masked protection. Floor registers are cut before adhesive spreads on a condo glue-down. Share the trade chart so stain matching finishes before a cabinet shop orders a conflicting colour.
Questions on this page
How long from samples to install in Toronto?
Typical projects span sample and free stain matching approval (1–3 weeks), optional condo board review (2–6 weeks), production lead time (project-specific), acclimation (several days), install days (scales with square footage), and adhesive cure (several days). Contact Floors Toronto for your schedule.
When does stain matching happen in the timeline?
Complimentary custom stain matching runs after width and grade selection, often in parallel with Toronto condo board submissions. Production locks only after signed colour approval.
How many acclimation days does Toronto hardwood need?
Floors Toronto acclimates engineered oak in the conditioned suite several days minimum with HVAC targeting roughly 35–55% RH — not 20–30% winter extremes or 60–70% summer peaks during acclimation.
How long is glue-down cure before furniture?
Adhesive guidance often specifies several days after install before heavy furniture returns. Floors Toronto aligns cure windows with condo quiet hours and the move-in plan.
Do pattern floors take longer to install?
Yes. Herringbone 5 by 25 inch and chevron 5 by 25½ inch layouts add labour versus straight 7½ inch plank. Budget extra install days on the quote.
Can board approval delay my timeline?
Yes. Toronto condominium alteration reviews commonly add 2–6 weeks before freight elevators and adhesive days can be booked, especially when acoustic sheets or sample boards are requested mid-review. Parallelize free custom stain matching during that window.
What RH should HVAC hold during install week?
Target 35–55% RH during acclimation, install, and cure. Toronto winters at 20–30% RH or summers at 60–70% RH without conditioning stress the seams.
Where do I request a timeline for my project?
Contact Floors Toronto with address type, square footage, format, and corporation rules. Specialists reply within one business day with phased next steps.
Floors already on this calendar.
Toronto herringbone, Raw Sienna
A residential herringbone field with layout, borders, and Grade AB or ABC supply and install.
2 photosGrade ABGlue-down
Markham straight plank, Mahogany
Supply, acclimation, and a method matched to the subfloor.
16 photosGrade ABCNail-down
Mississauga chevron, Soft White
A chevron field with mitres, a batch-locked stain, and a UV-cured finish.
9 photosGrade ABNail-down
(07) — Start your project
Tell us about your space.
What do you need?
Supply and install. Our oak, then our crew: measure, moisture, method, and a written 5-year workmanship warranty.
- Reply within 1 business day
- Stain match included when you order
- Itemised, no-obligation quote
- Insured crews, 5-year workmanship warranty
The quote request is in.
We reply within one business day. If the job includes install, the reply separates supply from the method and the subfloor. If you want samples, we send them on the real oak. If a site measure is needed, we book it from that reply.
If you chose a colour photo, email the file to tymur@floorstoronto.ca with your name so the match can start. The form stores the file name, not the picture.