How long does flooring tear-out take in a Toronto condo?
Most occupied Toronto condominium suites between 800 and 1,400 square feet require 1–2 days for tear-out, adhesive scrape, and debris removal when freight elevators and hallway protection are booked in advance. Larger combined living-dining layouts or vinyl-over-concrete assemblies can extend to 3 days. Floors Toronto schedules elevator pads and COI before demolition so property managers are not surprised on day one. Occupied indoor RH near 35–55% protects seams through Toronto winters that often fall to 20–30% RH and summers near 60–70% when unmanaged.
What adhesive residue levels require grinding before new hardwood?
Glue-down vinyl, carpet adhesive, and old mastic often leave patches that interfere with trowel-notched adhesive transfer for 3/4 inch engineered oak. Floors Toronto grinds or patches until flatness tolerances suit 7½", 9¼", and 10¼" faces — especially critical under wide plank glue-down. Remaining residue above manufacturer limits triggers additional prep line items rather than hopeful installs. Floors Toronto specifies 3/4 inch European white oak engineered hardwood with UV-cured finish, Grade AB or ABC options, and free custom stain matching.
Does leveling happen before or after moisture testing?
Sequence matters. After tear-out exposes bare concrete or plywood, Floors Toronto performs moisture testing on slabs before final leveling compounds cure — elevated readings must clear before glue-down is scheduled. Wood subfloors skip concrete moisture meters but still receive flatness correction and squeak repair. Prep hands off cleanly to our moisture testing and subfloor prep gate when only testing is needed first.
Can you remove flooring in an occupied Toronto home?
Yes. House renovations across the Annex, Leslieville, and North York often proceed room-by-room so kitchens and stair landings stay usable. Dust containment, HEPA vacuuming, and daily cleanup protect millwork already on site. Nail-down tear-out on plywood differs from glued vinyl on concrete — Floors Toronto quotes method-specific labour after a walkthrough.
What square footage ranges do you typically prep?
Residential tear-out and prep commonly spans 600–3,500 square feet per phase. Whole-house GTA renovations at 2,000–4,500 square feet may split demolition and leveling across two mobilizations when trades overlap. Condo scopes under 1,200 square feet still need the same flatness discipline as larger footprints because wide faces telegraph prep defects.
How does prep connect to new engineered hardwood install?
Floors Toronto treats tear-out and leveling as the front half of a renovation sequence: remove old flooring, scrape adhesive, correct flatness, pass moisture gates, then install 3/4 inch European white oak engineered hardwood via glue-down, floating, or nail-down per substrate. See condo installation and the renovation guide for downstream steps.
Do you haul away old flooring materials?
Debris removal is planned in the quote — especially important in Toronto towers where freight elevators and loading dock windows are time-limited. Carpet, tile, vinyl, and hardwood layers are separated for disposal according to site rules. Property managers often require proof of protection before and after demolition.