It fits
The deck is sound plywood or OSB, and you want the floor fastened to the structure. An occupied house takes less adhesive this way. Widths we supply are 7 1/2, 9 1/4, and 10 1/4 inch.
(01) — Nail-down
Nail-down fastens the plank through the tongue into plywood or OSB. This is the usual method in a house. Concrete cannot take a nail.
(02) — The method
Four ways the same oak goes down. Pick one to see what it sits on.
The deck is sound plywood or OSB, and you want the floor fastened to the structure. An occupied house takes less adhesive this way. Widths we supply are 7 1/2, 9 1/4, and 10 1/4 inch.
A concrete slab cannot take a nail. That job is glue-down or floating. Herringbone or chevron on wood may need glue-assist. The quote says so before install day.
The boards are glued to the slab. This is the usual choice on concrete when the building allows a glued floor. It feels solid underfoot. We test the slab for moisture first. If the reading is high, we wait or treat it. We do not glue onto a wet slab, and we do not nail into concrete.
A bead of adhesive plus nails into plywood. We use this when herringbone or chevron needs extra hold on a wood floor. The pattern labour is its own band. The quote says so before install day.
Cleats go through the tongue into plywood or OSB. This is the usual method in a house. You will hear the nailer. If you are living there, we work room by room.
The boards click together over a pad. Nothing is glued or nailed to the slab. Condo buildings ask for this when they want a sound layer. The pad is its own line on the quote. Doors and elevator sills are checked so they still clear.
(03) — The process
Concrete cannot take a nail. The deck is confirmed before the first cleat.
We confirm plywood or OSB is thick enough and sound. If we find concrete, that room becomes glue-down or floating.
High and low spots are corrected. A wide board shows a wave that a narrow one would hide.
They sit in the room, toward 35–55% humidity, before the first nail.
Cleats or staples follow the product. Herringbone or chevron on wood may also get a bead of glue so the pattern holds. That is written on the quote. The nailer is loud. If you are living there, we work room by room. Stairs and transitions in the same stain are listed when the house needs them.
(04) — The quote
These bands are not a rate card. Stairs and transitions are itemised when the quote lists them. See stairs and transitions and house installation. The full table is on the cost guide.
(05) — Installation only
If it is hardwood, we can install it. Send the brand, the type, the square feet, and a photo of the box label. We look at the product and the subfloor before we name a method. Laminate and vinyl are not on this list.
(06) — Start your project
What do you need?
Supply and install. Our oak, then our crew: measure, moisture, method, and a written 5-year workmanship warranty.
We reply within one business day. If the job includes install, the reply separates supply from the method and the subfloor. If you want samples, we send them on the real oak. If a site measure is needed, we book it from that reply.
If you chose a colour photo, email the file to tymur@floorstoronto.ca with your name so the match can start. The form stores the file name, not the picture.
Nail-down fastens the engineered plank through the tongue into a wood subfloor, plywood or OSB, with cleats or staples. It is the usual method in a house.
No. Concrete cannot take a nail. A slab is glue-down, or floating when the building requires underlay.
When the subfloor is sound plywood or OSB and you want the floor fastened to the structure. It uses less adhesive in an occupied house.
Not always. On wood, those layouts may need glue-assist. The quote says so before install day. Straight plank follows the product’s cleat or staple schedule.
Stairs and transitions are in the quote when the house needs them, in the same stain batch. They are itemised, not assumed.
Yes, when the product is hardwood. We inspect it and the subfloor before we commit to a method. Laminate and vinyl are not on the list. Our 5-year workmanship warranty covers the installation we do. The manufacturer’s warranty stays with the manufacturer.
(08) — Next
The plank bonded to concrete, when the building allows it.
The floor locks over underlay when the building asks for an acoustic layer.
Nail-down on a wood deck, with stairs when the quote lists them.
Treads, risers, and the change between finishes.
Boards in the house before the first cleat.
How the three methods sit in one job.
Updated 23 October 2026