FLOORSToronto

The building stays open.Commercial hardwood flooring Toronto

An occupied commercial building stays open while the floor goes in. The work follows the hours the building can give. Lobbies stay open while corridors and floors turn. A certificate of insurance and an elevator booking are arranged where the building requires them, and moisture testing on the concrete happens before adhesive days. 3/4 inch European white oak, stain match when you order, supply from $10.25/sq ft.

How we work with commercial clients.

Entertainment District workplaces, Yorkville amenity renovations, King West studios, and Mississauga or Vaughan corporate suites use the same oak with different access rules. The path below is the order of the work.

Soft White straight plank oak floor

The work follows the hours the building can give, including after-hours windows.

Linen Oak straight plank floor

Boards go to the suite or the site office and are picked up after review under the installed lights. Sample delivery

Soft White herringbone oak floor

A certificate of insurance where the building requires one, plus the method notes. An elevator booking where the building requires one.

Mist Oak chevron floor

Phased work turns corridors and floors while the lobby stays in use. Later phases stay on the reserved dye lot so the floors still read as one specification.

Warm Buff chevron oak floor

The occupied job closes on the written workmanship warranty. Warranty

Where the floor goes.

Offices

Reception, conference, and open floors, with a quiet install window.

Amenity rooms

Lobbies, lounges, and shared rooms that need a UV-cured finish and a consistent dye lot.

Phased suites

Corridors and suites that turn in phases, with the colour locked across those floors.

Studios

Client-facing rooms where the floor has to meet the millwork standard.

The occupied job closes on the written workmanship warranty. Warranty

Hospitality and retail

Questions from the building.

Can a lobby stay open while a corridor turns?

Yes. Phased scopes keep lobbies open while corridors and floors turn over. Later phases stay on the reserved dye lot so the floors still read as one specification.

Do you work inside the building’s hours, including after hours?

Yes. The work follows the hours the building can give, including after-hours windows.

What does a property manager receive for access?

A certificate of insurance where the building requires one, plus the method notes. Elevator bookings are coordinated when the building requires them.

Where are samples approved?

On the suite or at the site office, under the installed lighting and the daylight in that room. Boards are picked up after review. Sample delivery

How is this different from hospitality and retail?

This page is for offices, amenity floors, and other occupied commercial buildings. Hospitality and retail is for hotels, restaurants, and branded retail flagships. Hospitality and retail

Is the UV finish what you specify for commercial foot traffic?

Yes. The UV-cured aluminum oxide finish is what Floors Toronto specifies for commercial foot traffic when it is maintained. UV aluminum oxide finish

Send the hours.

What do you need?

Supply and install. Our oak, then our crew: measure, moisture, method, and a written 5-year workmanship warranty.

  • Choose Commercial on the first step
  • Hours and the open path in the notes
  • After-hours windows and phased corridors
  • Workmanship warranty in the reply

Step 1 of 3

Building
What should the quote include?
Call Get a quote