FLOORSToronto

Hardwood Flooring Scarborough

Town Centre high-rises in Scarborough sit on concrete. Houses in Agincourt, Guildwood, and the Bluffs sit on plywood. Iberian Oak straight plank is the Scarborough renovation on file. Glue-down or floating is the tower method, and nail-down or glue-down is the house method. Samples are at AA Floors, 524 Evans Ave, or we deliver boards. 3/4 inch European white oak, stain match when you order, supply from $4/sq ft.

Town Centre high-rises

Condominium buildings near Scarborough Town Centre and along the corridor sit on concrete. Glue-down or floating needs board approvals, acoustic packages when required, a freight-elevator booking, and a moisture test before adhesive. A Town Centre suite on this European white oak line uses glue-down after that test. 7½ inch planks suit the tighter suites. Condo installation

Agincourt, Guildwood, and the Bluffs

Detached and semi-detached houses sit on plywood. Nail-down or glue-down is the house method, with driveway staging, and stairs and kitchens often share the renovation. Many of these jobs are house-led on plywood. A Guildwood house often lands on 9¼ inch Grade ABC character oak. 9¼ and 10¼ inch planks suit open houses with longer sightlines. Nail-down

Seasonal RH in Scarborough tracks Toronto: winter forced-air heat often hits 20–30% indoors, unmanaged summers climb toward 60–70%, and the occupied target is 35–55%.

How does Town Centre concrete differ from houses in Agincourt, Guildwood, and the Bluffs?

Town Centre and corridor high-rises sit on concrete. Glue-down or floating needs board approvals, acoustic packages when required, and a freight-elevator booking. Houses in Agincourt, Guildwood, and the Bluffs sit on plywood, where nail-down or glue-down and driveway staging are the usual path. Many of those house jobs are house-led on plywood. A Guildwood house often lands on 9¼ inch Grade ABC character oak. A Town Centre suite on the same European white oak line uses glue-down after moisture testing.

How are 401 deliveries timed for freight elevators or driveway crews?

East-end traffic on the 401 and local arterials is planned into delivery windows so crates arrive when a freight elevator or a driveway crew is ready. Stairs and halls often set the critical path on house renovations.

Do Town Centre slabs get a moisture test before glue-down?

Yes. Moisture testing gates glue-down adhesive. Elevated readings mean remediation or a method change before the install is scheduled. Newer mid-rises are moisture-tested first, the same way a Town Centre slab is.

401 delivery windows

East-end traffic on the 401 and local arterials is planned into delivery windows so crates arrive when a freight elevator or a driveway crew is ready.

Stairs and halls often set the critical path in house renovations. Newer mid-rises are moisture-tested first, the same way a Town Centre slab is.

Share the address type, the square footage, the preferred width or pattern, photos, and any board documents for a condominium.

Start your project

Tell us about your space.

What do you need?

Supply and install. Our oak, then our crew: measure, moisture, method, and a written 5-year workmanship warranty.

  • Reply within 1 business day
  • Stain match included when you order
  • Itemised, no-obligation quote
  • Insured crews, 5-year workmanship warranty

Step 1 of 3

Building
What should the quote include?
Call Get a quote